Find Jobs
Hire Freelancers

ASP Gantt Chart for Project Management System

$100-125 USD

Selesai
Dibuat sekitar 19 tahun yang lalu

$100-125 USD

Dibayar ketika dikirim
Need a dynamically created Gantt chart to integrate into existing ASP-based project management software (demo available at [[login to view URL]][1]). Must graphically represent relationships between tasks in the project flow, and differentiate critical-path from non-critical-path tasks. Must also graphically represent percentage of work done for each task. Tasks shown in the chart must link to details for the task (task details are an existing part of the system; only the link needs to be set up). Chart may be either html or flash format, so long as it integrates with the existing system. Access database is designed to contain all necessary information for population of the chart, including: task start date, task end date, duration, relationship to other tasks, critical path indication, etc. All necessary information is contained in one table except the completion percentage for each task, which is a simple calculation based on information in a related table. ******Update******** To log in to the demo site mentioned above, use "demo" as the username & password. ## Deliverables Rent A Coder requirements notice: As originally posted, this bid request does not have complete details. Should a dispute arise and this project go into arbitration "as is", the contract's vagueness might cause it to be interpreted against you, even though you were acting in good-faith. So for your protection, if you are interested in this project, please work-out and document the requirements onsite. 1) Complete and fully-functional working program(s) in executable form as well as complete source code of all work done. 2) Deliverables must be in ready-to-run condition, as follows (depending on the nature of the deliverables): a) For web sites or other server-side deliverables intended to only ever exist in one place in the Buyer's environment--Deliverables must be installed by the Seller in ready-to-run condition in the Buyer's environment. b) For all others including desktop software or software the buyer intends to distribute: A software installation package that will install the software in ready-to-run condition on the platform(s) specified in this bid request. 3) All deliverables will be considered "work made for hire" under U.S. Copyright law. Buyer will receive exclusive and complete copyrights to all work purchased. (No GPL, GNU, 3rd party components, etc. unless all copyright ramifications are explained AND AGREED TO by the buyer on the site per the coder's Seller Legal Agreement). 4) Well-commented code for future reference ## Platform ASP
ID Proyek: 3562579

Tentang proyek

3 proposal
Proyek remot
Aktif 19 tahun yang lalu

Ingin menghasilkan uang?

Keuntungan menawar di Freelancer

Tentukan anggaran dan garis waktu Anda
Dapatkan bayaran atas pekerjaan Anda
Uraikan proposal Anda
Gratis mendaftar dan menawar pekerjaan
Diberikan kepada:
Avatar Pengguna
See private message.
$85 USD dalam 10 hari
5,0 (16 ulasan)
4,3
4,3
3 freelancer menawar dengan rata-rata $88 USD untuk pekerjaan ini
Avatar Pengguna
See private message.
$89,25 USD dalam 10 hari
5,0 (12 ulasan)
3,7
3,7
Avatar Pengguna
See private message.
$90,10 USD dalam 10 hari
0,0 (0 ulasan)
0,0
0,0

Tentang klien

Bendera UNITED STATES
Louisville, United States
5,0
25
Memverifikasi Metode pembayaran
Anggota sejak Feb 10, 2005

Verifikasi Klien

Terima kasih! Kami telah mengirim Anda email untuk mengklaim kredit gratis Anda.
Anda sesuatu yang salah saat mengirimkan Anda email. Silakan coba lagi.
Pengguna Terdaftar Total Pekerjaan Terpasang
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Memuat pratinjau
Izin diberikan untuk Geolokasi.
Sesi login Anda telah kedaluwarsa dan Anda sudah keluar. Silakan login kembali.