Just share me the Single line diagram with all the technical details of the switchgers connected to it like Gen, Transformers, motors, busbars, breakers, CT and PT etc.
Relevant Skills and Experience
4 years of Experience in Electrical Circuit & Control Design, ETAP, Load flow calculation, Automation, Electrical drawing, Auto CAD and power system protection and coordination.
Proposed Milestones
$111 USD - Complete project
Experienced in Electrical Circuit & Control Design, ETAP, Load flow calculation, Automation, Electrical drawing, Auto CAD and power system protection and coordination.
Worked in several Energy Saving Projects consisting of IE3 motors, VFDs and Auto Power Factor Controllor.
Experienced professional in renewable sector with more than 4 years of experience in thermal biomass power plant with several successful energy saving and automation projects.
Currently heading Electrical design and commissioning team of two new 10 MW thermal power plants.