In MS Access Create a Form and Table that will allow the User to Create a Work Breakdown Structure (Tree)

  • Status: Closed
  • Hadiah: $190
  • Entri Diterima: 5
  • Pemenang: NourElDeen

Deskripsi Kontes

In MS Access Create a Form and Table that will allow the User to Create a Work Breakdown Structure (Tree). I did this contest once before but allowed the winner to do it in .Net which was a mistake for me. THIS MUST BE IN ACCESS - VBA OR SQL I have an Attachment for more details

I added a second attachment that has more details to hopefully help you understand my needs.

Keahlian yang Disarankan

Umpan balik Pemberi kerja

“Yes I will absolutely hire again. Awesome work.”

Gambar profil gehyman22002, United States.

Entri teratas dari kontes ini

Tampilkan Entri Lainnya

Papan Klarifikasi Publik

  • newpast
    newpast
    • 5 tahun yang lalu

    I Think you may #increaseprize

    • 5 tahun yang lalu
  • newpast
    newpast
    • 5 tahun yang lalu

    I am fluent in VBA and could build the Pure VBA version for you
    It will work on both 32 / 64 bit version of MS Access without any modification and no need for any installation or external lib
    The tree will be drown on text box or a list view that is a built in MS Access

    the fields you mentioned is not a meter and view both tchements

    • 5 tahun yang lalu
  • newpast
    newpast
    • 5 tahun yang lalu

    To make your needs
    We have two methods
    - Pure VBA - Access and will not give a nice view but will run out of box on any computer
    - Active X based and will give nice view

    the requirement you are explain is ok and could be make by the both methds

    • 5 tahun yang lalu
  • gehyman22002
    Penyelenggara Kontes
    • 5 tahun yang lalu

    Attached is an updated detailed explanation of what I need. See Rev 1 Attachment

    • 5 tahun yang lalu
  • gehyman22002
    Penyelenggara Kontes
    • 5 tahun yang lalu

    The Tree needs to have the "WBS" Number and the title (Description) Like entry number 6 but with number first and title next to it. Enty #5 looks very close to what I need, but it dosent show the title in the tree.

    • 5 tahun yang lalu
  • freelancersree24
    freelancersree24
    • 5 tahun yang lalu

    Please check my entry.

    • 5 tahun yang lalu
  • gehyman22002
    Penyelenggara Kontes
    • 5 tahun yang lalu

    Not what I am looking for. Please look at the Attachment for the contest. This is not MS Access Tree Function.

    • 5 tahun yang lalu
    1. fuentro
      fuentro
      • 5 tahun yang lalu

      I mentioned in my entry it wasn't exactly as the powerpoint but that the functionality was pretty much the same and I could work on something more like the PPT but needed your feedback

      • 5 tahun yang lalu
  • fuentro
    fuentro
    • 5 tahun yang lalu

    Please check out my entry and provide feedback if applicable.

    • 5 tahun yang lalu

Lihat lebih banyak komen

Bagaimana untuk memulai sebuah kontes

  • Buat kontes Anda

    Buat Kontes Anda Cepat dan mudah

  • Dapatkan jutaan entri

    Dapatkan Jutaan Entri Dari seluruh dunia

  • Pilih entri terbaik

    Pilih entri terbaik Unggah file - Mudah!

Buat sebuah Kontes Sekarang atau Gabung dengan kami Hari ini!